Free shipping from 125 Euro. Valid only for (Germany, Austria, Poland, Slovakia, Hungary). We have over 8000 knives and other accessories in stock in our shop!

Böker Long Lead EDC

Code: 01SC080
Not rated
€28,20 –7 %
114492 boker long lead edc 01sc080
€28,20 –7 % €25,98 Measure price:
On order, usually 20 days
Delivery to:
02/12/2026

Detailed information

Product detailed description

The Magnum Long Lead EDC is a classic men's and gourmet pocket knife for everyday use that immediately impresses with its simple, slightly curved design. The no-cost design is matched by the technical construction as a slip joint knife, which has proven itself a million times over thanks to its simple operation and fewer parts. The satin-finished 8Cr13MoV stainless steel blade is ground flat and is opened manually with the nail. The slightly contoured handle made of textured G10 material feels comfortable in the hand.

Overall length: 18.4 cm
Blade length: 8 cm
Blade thickness: 2.7 mm
Weight: 78 g
Blade material: 8Cr13MoV
Handle material: G10

Additional parameters

Category: Folding knives
EAN: 4045011226663
Blade material: stainless PLUS
Blade length: 8 to 10cm
Handle material: G-10
Aktualizace: BOKER24

Discussion

Be the first who will post an article to this item!

Do not fill out this field

Security check

Vložením komentáře souhlasíte s podmínkami ochrany osobních údajů

bokermag

The roots of Böker go back to the 17th century, when the family forge operated in Remscheid and focused on steel processing and edge tools. Over time, practical experience shaped a technical mindset that balanced durability, cutting performance, and reliability. The expansion into sabres and rapiers around 1829–1830 marked a decisive technological step, demanding precise heat treatment and consistent blade geometry. With more than a hundred skilled craftsmen employed, the company gained the capacity to refine production without losing its artisanal foundation.

During the second half of the 19th century, parts of the family moved to North America, establishing facilities in the USA and Canada. This international presence allowed experimentation with new designs and materials. Today, major production remains in Solingen, supported by manufacturing in the USA and Argentina, while modern CNC machining ensures tight tolerances and repeatable results. Böker develops knives in-house and in collaboration with well-known makers, delivering tools that combine engineering precision with practical usability, including the widely distributed MAGNUM line aimed at robust everyday performance.



Manufacturing company : Heinrich Böker Baumwerk GmbH
Vytvořil Shoptet | Design Shoptak.cz.